• Large watermain install, Gottingen and North (1919)
  • Loch Lomond Drinking Water Treatment Facility
  • Halifax crew cleaning pumping station (2017)
  • Tower Road Dam
  • Lake Major Dam repair (2015)
  • Wastewater Treatment Facility wet well construction (2006)

ACWWA Guidelines - Updating for Climate Change

The ACWWA project "Incorporating Climate Resilience for Municipal Infrastructure" was created to facilitate the collection and dissemination of current information on climate change. Resultant guidelines now include the following documents:

  1. ACWWA Water Supply Guidelines 2022;

  2. ACWWA Wastewater Guidelines 2022;

  3. Previous Guidelines Final and Draft;

  4. Eight (8) Water/Wastewater Guidelines from other jurisdictions.

 

The files can be accessed by clicking HERE.

 

 

Sponsors - Platinum

CBCL McLennan Sales, Div od Emco Corporation Neptune Technology Group Canada Co. Englobe Corp. City of Moncton Greatario Engineered Storage Systems Atlantic Purification System

Sponsors - Gold

Iconix Waterworks Mueller Xylem Canada WSP Canada Inc. Grande

Sponsors - Silver

Wolseley Waterworks DesignPoint Engineering & Surveying Ltd McWane Canada