• Large watermain install, Gottingen and North (1919)
  • Loch Lomond Drinking Water Treatment Facility
  • Halifax crew cleaning pumping station (2017)
  • Tower Road Dam
  • Lake Major Dam repair (2015)
  • Wastewater Treatment Facility wet well construction (2006)

ACWWA Guidelines - Updating for Climate Change

The ACWWA project Incorporating Climate Resilience for Municipal Infrastructure into the Updates of Existing Atlantic Canada Water and Wastewater Design Guidelines was impacted by COVID – 19 and as a result the 2022 Guides listed below were delayed. The Stakeholder Notification dated May 20, 2020 (downloaded HERE) outlines the delay.

The Knowledge Mobilization Plan created to facilitate the collection and dissemination of current information on climate change and guidelines development now includes the following documents:

  1. ACWWA Water Supply Guidelines 2022;

  2. ACWWA Wastewater Guidelines 2022;

  3. Previous Guidelines Final and Draft;

  4. Eight (8) Water/Wastewater Guidelines from other jurisdictions.

 

Downloads of the documents have been encouraging, and the files can be accessed by clicking HERE.

 

Email SignUp

If you would like to receive our emails regarding course, conference, and other Association information,  please enter details below.

After you click the Submit button, a Success! message will be displayed after a short delay. You must then respond to a confirmation email sent to your supplied address. Remember to check your Spam and Junk email folders.

2025 Platinum Sponsors

EXP Services Inc Greatario Engineered Storage Systems Wolseley Waterworks
Atlantic Purification System Iconix Waterworks McLennan Sales, Div od Emco Corporation

Gold Sponsors

Mueller Port City Water Services WSP Canada Inc. Xylem Canada
Aquastore Canada East Neptune Technology Group Canada Co. Scantron Robotics Inc

Additional Sponsors

Flowstar Industrial ULC City of Moncton Kamstrup Water Metering